District 9

Teton, Sublette, and Fremont Counties

East Fork Tributaries

Water delivery and management system development on Pine Creek and Meadow Creek in the East Fork drainage, including diversion structures, delivery pipelines, and other irrigation and water management infrastructure


Total Project Cost: $376,500WWNRT Funded: $150,000Sponsor: Trout Unlimited

Upper Dunoir Fish Screens

Development and placement of fish screens in two branches of the Dunoir River west of Dubois


Total Project Cost: $146,000WWNRT Funded: $70,000Sponsor: Trout Unlimited

Bare Creek

Reconstruction of fish barrier on the upper reaches of Cottonwood Creek in Sublette County


Total Project Cost: $154,200WWNRT Funded: $77,100Sponsor: Trout Unlimited

Bryan Flats

Removal of encroaching conifers through prescribed fire and mechanical treatment


Total Project Cost: $137,700WWNRT Funded: $25,000Sponsor: Wyoming Game and Fish

South Pass Aspen

Habitat enhancement by removal of conifers from aspen stands and other habitats of high value to elk, deer, and other species. Mechanism of treatment included fire, mechanical, and other removal techniques appropriate to the area


Total Project Cost: $542,600WWNRT Funded: $195,000Sponsor: Wyoming Game and Fish

Red Rock Fire Nutrition

Evaluation of the nutritional needs and changes in diet following fire as a treatment to enhance seasonal ranges for big game species.


Total Project Cost: $119,410WWNRT Funded: $10,000Sponsor: Wyoming Game and Fish




Upper Big Sandy

Placement of an adequate barrier to upward fish migration by non-native fish into spawning and fish-rearing habitats for native fishes considered "at risk" due to predation, hybridation, and loss of habitation of the Big Sandy River.


Total Project Cost: $849,670WWNRT Funded: $195,000Sponsor: Wyoming Game and Fish

Red Canyon WHMA Pipeline

Structural improvements to irrigation systems to eliminate erosion and water loss from an antiquated ditch delivery system in Fremont County, specifically pipe, fittings, headgates and other water control equipment.


Total Project Cost: $32,520WWNRT Funded: $15,000Sponsor: Wyoming Game and Fish

Spence Moriarty Meadows

Continuation of projects to improve water use, forage production, and management of winter forage for elk, deer, bighorn sheep and other species by placement of appropriate infrastructure, specifically pipe, fittings, headgates and other water control equipment.


Total Project Cost: $42,560WWNRT Funded: $55,000Sponsor: Wyoming Game and Fish

Jackson Hole Wetlands II

Continuation of beaver relocation project to remove problem animals from areas of destruction and place them in areas where beaver activity will increase and enhance wetland values


Total Project Cost: $323,639WWNRT Funded: $30,000Sponsor: Wyoming Wetlands Society